AES Standards Logo
spacing
About AES Standards
AES Standards news
Drafts for comment
Published documents
Groups and projects
Participation
Members log-in
Audio Engineering Society Standards Committee spacing
spacing
October 2008 meeting of SC-03-01

Audio Engineering Society

Standards Committee

Notice and agenda for the meeting of
SC-03-01
(formerly SC-01 Subcommittee) Working Group on Analog Recording

of the SC-03 Subcommittee on the Preservation and Restoration of Audio Recording

To be held in conjunction with the upcoming AES 125th Convention in San Francisco, CA., US., 2008-10. The meeting is scheduled to take place at the Moscone Convention Center. Please check the latest schedule at http://www.aes.org/standards/

  1. Introduction to working group and attendees
  2. Amendments to and approval of agenda
  3. Approval of report of previous meeting

Held in Amsterdam, Netherlands, 2008-05.

  1. Open Projects

One or more of these projects may be in the process of a formal Call for Comment (CFC), as indicated by the project status. In these cases only, due process requires that any comments be published.

AES6-R: Review of AES6-1982 (r2003): Method for measurement of weighted peak flutter of sound recording and reproducing equipment

Project scope: This standard specifies the "weighted peak" method of measuring flutter of sound recorders and reproducers for normal audio usage. For special purposes--high speed duplicators, different speeds in recording and reproducing, etc.--special procedures not described here should, if required, be used.
Assigned to: SC-03-01 , Status: Revised sec PWD posted to SC-03-01 doc site and notified to SC-03-01, 2008-07-31
Intent: Revision , Initiated: 2003 , Target: 2008
Current goal: PWD , Goal date: 2008-10

  1. Liaisons
  2. New Projects
  3. New Business
  4. Date of next meeting

NOTES:
  • Please make sure you sign the attendance sheet that will be circulated. This sheet shall be passed to the secretariat after the meeting.
  • Please make sure that any documents contributed to the meeting are passed to the secretariat who will ensure they are posted to the appropriate Working Group document site.
page updated 2008-09-24

Maintenance Annex

The following projects are subject to periodic review, however no issues have been identified for discussion so far. If you wish to propose a matter for discussion regarding any of these projects, please send an e-mail message to the working group before the meeting, or inform the chair at the beginning of the meeting.

AES-R2: Review of AES-R2-2004, AES project report for articles on professional audio and for equipment specifications - Notations for expressing levels

Status: No action required
Intent: Review , Initiated: 2004 , Target: n/a
Current goal: Status report , Goal date: Continuing

AES7-R: Review of AES7-2000 (r2005): AES standard for the preservation and restoration of audio recording - Method of measuring recorded fluxivity of magnetic sound records at medium wavelengths

Status: No action requested or required
Intent: Review , Initiated: 2005 , Target: 2010
Current goal: Status report , Goal date: Continuing
spacing


For more information about standards activity, e-mail to

AES Standards Home

(C) 2008, Audio Engineering Society, Inc.